{"id":4847,"date":"2025-09-29T07:09:00","date_gmt":"2025-09-29T03:39:00","guid":{"rendered":"https:\/\/osvehboiler.com\/services\/villa-construction\/"},"modified":"2025-08-06T15:52:36","modified_gmt":"2025-08-06T12:22:36","slug":"boiler-repair","status":"publish","type":"services","link":"https:\/\/osvehboiler.com\/en\/services\/boiler-repair\/","title":{"rendered":"Boiler repair"},"content":{"rendered":"\n<h1 class=\"wp-block-heading has-small-font-size\">When servicing the boiler:<\/h1>\n\n<p class=\"wp-block-paragraph\">In order to prevent burns and the resulting hazards, ensure that the steam boiler is cold before performing repair and maintenance operations.<\/p>\n\n<p class=\"wp-block-paragraph\">Due to the use of high-voltage electricity, all electrical connections to the system must be disconnected to prevent the risk of electric shock.<\/p>\n\n<p class=\"wp-block-paragraph\">Make sure the boiler&#8217;s drain is open and not blocked. <\/p>\n\n<h1 class=\"wp-block-heading has-small-font-size\">During operations<\/h1>\n\n<p class=\"wp-block-paragraph\">Boiler inspection checklists should be completed by the operator at specified times.<\/p>\n\n<p class=\"wp-block-paragraph\">The ventilation and exhaust exits of the steam boiler must not be blocked in any way and must always remain open.<\/p>\n\n<p class=\"wp-block-paragraph\">Never leave a steam boiler without water.<\/p>\n\n<p class=\"wp-block-paragraph\">The device operator must be present at the boiler operation site 24 hours a day and ensure the proper functioning of the boiler.<\/p>\n\n<h1 class=\"wp-block-heading has-small-font-size\">Warning:<\/h1>\n\n<h1 class=\"wp-block-heading has-small-font-size\">Operator<\/h1>\n\n<ul class=\"wp-block-list\">\n<li>Please read the following instructions in full. Failure to comply with the above items will result in<\/li>\n\n\n\n<li>Failure to follow these instructions can result in financial and personal injury.<\/li>\n\n\n\n<li>This manual is intended exclusively for technical personnel familiar with steam boilers.<\/li>\n\n\n\n<li>The checklists provided in this manual are periodically completed and<\/li>\n\n\n\n<li>It will be reviewed annually.<\/li>\n\n\n\n<li>Prevent unauthorized persons from entering the engine room.<\/li>\n<\/ul>\n\n<h1 class=\"wp-block-heading has-small-font-size\">Warning:<\/h1>\n\n<h1 class=\"wp-block-heading has-small-font-size\">Installer<\/h1>\n\n<ul class=\"wp-block-list\">\n<li>Read the manual completely before installing the device.<\/li>\n\n\n\n<li>All plumbing should be done based on the installation location of the device and using existing standards.<\/li>\n\n\n\n<li>The steam boilers have been tested in the factory and their proper functioning has been ensured.<\/li>\n\n\n\n<li>In case of any damage to the boiler, coordinate with the boiler manufacturer.<\/li>\n\n\n\n<li>Avoid opening any manhole covers or other items that may cause the system to become unsealed.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"featured_media":6075,"template":"","class_list":["post-4847","services","type-services","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/osvehboiler.com\/en\/wp-json\/wp\/v2\/services\/4847","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/osvehboiler.com\/en\/wp-json\/wp\/v2\/services"}],"about":[{"href":"https:\/\/osvehboiler.com\/en\/wp-json\/wp\/v2\/types\/services"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/osvehboiler.com\/en\/wp-json\/wp\/v2\/media\/6075"}],"wp:attachment":[{"href":"https:\/\/osvehboiler.com\/en\/wp-json\/wp\/v2\/media?parent=4847"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}