REBUILD

Construction of hot oil boiler

Hot oil boiler manufacturing involves the design and construction of a heat transfer system using hot oil as the medium. These systems are commonly used in industries that require high-temperature heat, such as the chemical, food, and textile industries. Learn more. Steps to build a hot oil boiler: 1. Design:…

Hot oil boiler manufacturing involves the design and construction of a heat transfer system using hot oil as the medium. These systems are commonly used in industries that require high-temperature heat, such as the chemical, food, and textile industries. Learn more.

Steps to build a hot oil boiler:

1. Design:

  • Determine the required thermal capacity based on process requirements.
  • Selecting the type of boiler (firetube, watertube or coiled) and designing the main components (shell, coil, burner, etc.).
  • Calculating the dimensions and thickness of parts based on working pressure and temperature.
  • Selecting the right materials for boiler construction (fireproof steel sheets and seamless pipes).
  • Boiler control and safety system design.
دستگاه نورد
Rolling for making hot oil boilers

2. Construction:

  • Cutting and shaping steel sheets based on design drawings.
  • Welding of boiler parts using skilled welders and in accordance with standards.
  • Installing pipes and heating coils inside the boiler.
  • Installation of auxiliary equipment such as burners, pumps, valves and sensors.
  • Conducting hydrostatic and radiographic tests to ensure manufacturing quality.
ورق نورد شده
Rolled sheet for making hot oil boilers

3. Installation and setup:

  • Installing the boiler in the desired location.
  • Connecting the boiler to plumbing, electrical, and control systems.
  • Initial boiler startup and setting of control parameters.
  • Training of boiler operating personnel.
بویلر روغن داغ
Installation and commissioning of hot oil boiler

PORTFOLIO

Some portfolio samples Construction of hot oil boiler

We Are Online!

Request a Free Consultation

If you need our services and are looking for expert advice from our engineering team, you can fill out the consultation form to get in touch with our specialists.
LOGO OSVEH
faq

Frequently Asked Questions

Answers to your most frequently asked questions

Depending on the capacity, the construction time is up to 30 working days. To inquire about the cost, please contact us or contact the company directly.
Depending on the capacity, the construction time is up to 30 working days. To inquire about the cost, please contact us or contact the company directly.
Depending on the capacity, the construction time is up to 30 working days. To inquire about the cost, please contact us or contact the company directly.
گروه ماشین سازان اسوه

Are you ready to build all kinds of steam boilers, boilers, and burners?

Over the years, we have gained the trust and satisfaction of our clients through numerous and diverse projects. From residential buildings to public and industrial projects, we have managed to excel in every field we operate in.